{"id":928,"date":"2014-01-30T21:48:24","date_gmt":"2014-01-31T02:48:24","guid":{"rendered":"http:\/\/www.dannysteyn.com\/blog\/?p=928"},"modified":"2014-02-08T18:30:22","modified_gmt":"2014-02-08T23:30:22","slug":"07-build-out-phase-part-3-new-photography-studio-design-project-from-start-to-finish","status":"publish","type":"post","link":"https:\/\/www.dannysteyn.com\/blog\/07-build-out-phase-part-3-new-photography-studio-design-project-from-start-to-finish\/","title":{"rendered":"Build Out Phase (Part 3) \u2013 New Photography Studio design project from start to finish"},"content":{"rendered":"<h1>Drywall is complete<\/h1>\n<p>We are 6 weeks into the project, and allowing for the break between Christmas and New Year, things are going pretty smoothly. The GC is keeping the project moving along, but to date we have drifted about 2 weeks behind our original schedule. Not a train smash but still a bit disappointing.<\/p>\n<p>All the interior drywalls are all complete. Both Studios as well as the Prop Room and the Gallery will have open ceilings, and these areas all received their dose of matte black paint. There will be some touch up required with the new AC vents that are still being installed.<\/p>\n<figure id=\"attachment_926\" aria-describedby=\"caption-attachment-926\" style=\"width: 1380px\" class=\"wp-caption alignnone\"><a href=\"http:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-28-2014-0012.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-926\" alt=\"Photography studio Editing Office dry-wall complete\" src=\"http:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-28-2014-0012.jpg\" width=\"1380\" height=\"925\" srcset=\"https:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-28-2014-0012.jpg 1380w, https:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-28-2014-0012-300x201.jpg 300w, https:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-28-2014-0012-1024x686.jpg 1024w, https:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-28-2014-0012-447x300.jpg 447w\" sizes=\"(max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px\" \/><\/a><figcaption id=\"caption-attachment-926\" class=\"wp-caption-text\">Photography studio Editing Office dry-wall complete<\/figcaption><\/figure>\n<figure id=\"attachment_925\" aria-describedby=\"caption-attachment-925\" style=\"width: 1380px\" class=\"wp-caption alignnone\"><a href=\"http:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-28-2014-0011.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-925\" alt=\"Photography studio Prop Room dry-wall complete\" src=\"http:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-28-2014-0011.jpg\" width=\"1380\" height=\"925\" srcset=\"https:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-28-2014-0011.jpg 1380w, https:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-28-2014-0011-300x201.jpg 300w, https:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-28-2014-0011-1024x686.jpg 1024w, https:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-28-2014-0011-447x300.jpg 447w\" sizes=\"(max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px\" \/><\/a><figcaption id=\"caption-attachment-925\" class=\"wp-caption-text\">Photography studio Prop Room dry-wall complete<\/figcaption><\/figure>\n<figure id=\"attachment_927\" aria-describedby=\"caption-attachment-927\" style=\"width: 1380px\" class=\"wp-caption alignnone\"><a href=\"http:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-28-2014-0013.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-927\" alt=\"Photography studio Lobby dry-wall complete.\" src=\"http:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-28-2014-0013.jpg\" width=\"1380\" height=\"925\" srcset=\"https:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-28-2014-0013.jpg 1380w, https:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-28-2014-0013-300x201.jpg 300w, https:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-28-2014-0013-1024x686.jpg 1024w, https:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-28-2014-0013-447x300.jpg 447w\" sizes=\"(max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px\" \/><\/a><figcaption id=\"caption-attachment-927\" class=\"wp-caption-text\">Photography studio Lobby dry-wall complete.<\/figcaption><\/figure>\n<h1>Floor tiling has commenced<\/h1>\n<p>The floor guys have started laying tile in the Lobby, Office and Gallery areas. We had to make a small design change in the Lobby due to the layout of the doors. Unfortunately this means more of one tile and less of another so the lobby will only be completed on Saturday. We had so many compliments on the lobby of our old studio that we have stayed with the same floor design; a dark marble border around a light marble fill. Doors will be black with frosted glass panels.<\/p>\n<figure id=\"attachment_930\" aria-describedby=\"caption-attachment-930\" style=\"width: 1380px\" class=\"wp-caption alignnone\"><a href=\"http:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-13-2014-0003.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-930\" alt=\"New Photography Studio construction - Entrance Lobby tiling underway\" src=\"http:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-13-2014-0003.jpg\" width=\"1380\" height=\"925\" srcset=\"https:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-13-2014-0003.jpg 1380w, https:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-13-2014-0003-300x201.jpg 300w, https:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-13-2014-0003-1024x686.jpg 1024w, https:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-13-2014-0003-447x300.jpg 447w\" sizes=\"(max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px\" \/><\/a><figcaption id=\"caption-attachment-930\" class=\"wp-caption-text\">New Photography Studio construction &#8211; Entrance Lobby tiling underway<\/figcaption><\/figure>\n<figure id=\"attachment_931\" aria-describedby=\"caption-attachment-931\" style=\"width: 1380px\" class=\"wp-caption alignnone\"><a href=\"http:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-13-2014-0005.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-931\" alt=\"New Photography Studio construction - Entrance Lobby tiling underway\" src=\"http:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-13-2014-0005.jpg\" width=\"1380\" height=\"925\" srcset=\"https:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-13-2014-0005.jpg 1380w, https:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-13-2014-0005-300x201.jpg 300w, https:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-13-2014-0005-1024x686.jpg 1024w, https:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-13-2014-0005-447x300.jpg 447w\" sizes=\"(max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px\" \/><\/a><figcaption id=\"caption-attachment-931\" class=\"wp-caption-text\">New Photography Studio construction &#8211; Entrance Lobby tiling underway<\/figcaption><\/figure>\n<figure id=\"attachment_932\" aria-describedby=\"caption-attachment-932\" style=\"width: 1380px\" class=\"wp-caption alignnone\"><a href=\"http:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-13-2014-0008.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-932\" alt=\"New Photography Studio construction - Editing Office tiling underway\" src=\"http:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-13-2014-0008.jpg\" width=\"1380\" height=\"925\" srcset=\"https:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-13-2014-0008.jpg 1380w, https:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-13-2014-0008-300x201.jpg 300w, https:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-13-2014-0008-1024x686.jpg 1024w, https:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-13-2014-0008-447x300.jpg 447w\" sizes=\"(max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px\" \/><\/a><figcaption id=\"caption-attachment-932\" class=\"wp-caption-text\">New Photography Studio construction &#8211; Editing Office tiling underway<\/figcaption><\/figure>\n<p>We chose a busier and slightly darker tile for the Editing Room as the light cream tiles in our previous studio editing room showed the dirt too easily.<\/p>\n<figure id=\"attachment_933\" aria-describedby=\"caption-attachment-933\" style=\"width: 1380px\" class=\"wp-caption alignnone\"><a href=\"http:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-13-2014-0011.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-933\" alt=\"New Photography Studio construction - Studio walls and window frames being painted\" src=\"http:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-13-2014-0011.jpg\" width=\"1380\" height=\"925\" srcset=\"https:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-13-2014-0011.jpg 1380w, https:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-13-2014-0011-300x201.jpg 300w, https:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-13-2014-0011-1024x686.jpg 1024w, https:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-13-2014-0011-447x300.jpg 447w\" sizes=\"(max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px\" \/><\/a><figcaption id=\"caption-attachment-933\" class=\"wp-caption-text\">New Photography Studio construction &#8211; Studio walls and window frames being painted<\/figcaption><\/figure>\n<h2>Interior oors are being custom made on site<\/h2>\n<p>Due to long lead times we were unable to purchase finished doors so we are having the GC custom make the doors on site. The finish carpenter is doing a great job with the 8ft tall wood doors that we purchased. He has cut out the recesses and is painstakingly installing the frosted glass panels<\/p>\n<figure id=\"attachment_934\" aria-describedby=\"caption-attachment-934\" style=\"width: 1380px\" class=\"wp-caption alignnone\"><a href=\"http:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-13-2014-0024.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-934\" alt=\"New Photography Studio construction - 8ft tall doors being custom made on site\" src=\"http:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-13-2014-0024.jpg\" width=\"1380\" height=\"925\" srcset=\"https:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-13-2014-0024.jpg 1380w, https:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-13-2014-0024-300x201.jpg 300w, https:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-13-2014-0024-1024x686.jpg 1024w, https:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-13-2014-0024-447x300.jpg 447w\" sizes=\"(max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px\" \/><\/a><figcaption id=\"caption-attachment-934\" class=\"wp-caption-text\">New Photography Studio construction &#8211; 8ft tall doors being custom made on site<\/figcaption><\/figure>\n<figure id=\"attachment_935\" aria-describedby=\"caption-attachment-935\" style=\"width: 1380px\" class=\"wp-caption alignnone\"><a href=\"http:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-13-2014-0004.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-935\" alt=\"New Photography Studio construction - 8ft tall doors being custom made on site\" src=\"http:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-13-2014-0004.jpg\" width=\"1380\" height=\"925\" srcset=\"https:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-13-2014-0004.jpg 1380w, https:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-13-2014-0004-300x201.jpg 300w, https:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-13-2014-0004-1024x686.jpg 1024w, https:\/\/www.dannysteyn.com\/blog\/wp-content\/uploads\/2014\/01\/studio-build-1-13-2014-0004-447x300.jpg 447w\" sizes=\"(max-width: 767px) 89vw, (max-width: 1000px) 54vw, (max-width: 1071px) 543px, 580px\" \/><\/a><figcaption id=\"caption-attachment-935\" class=\"wp-caption-text\">New Photography Studio construction &#8211; 8ft tall doors being custom made on site<\/figcaption><\/figure>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Drywall is complete We are 6 weeks into the project, and allowing for the break between Christmas and New Year, things are going pretty smoothly. The GC is keeping the project moving along, but to date we have drifted about 2 weeks behind our original schedule. Not a train smash but still a bit disappointing. &hellip; <\/p>\n<p class=\"link-more\"><a href=\"https:\/\/www.dannysteyn.com\/blog\/07-build-out-phase-part-3-new-photography-studio-design-project-from-start-to-finish\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;Build Out Phase (Part 3) \u2013 New Photography Studio design project from start to finish&#8221;<\/span><\/a><\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_exactmetrics_skip_tracking":false,"_exactmetrics_sitenote_active":false,"_exactmetrics_sitenote_note":"","_exactmetrics_sitenote_category":0,"footnotes":""},"categories":[119],"tags":[121,125,124,122,126,123,120],"_links":{"self":[{"href":"https:\/\/www.dannysteyn.com\/blog\/wp-json\/wp\/v2\/posts\/928"}],"collection":[{"href":"https:\/\/www.dannysteyn.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.dannysteyn.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.dannysteyn.com\/blog\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.dannysteyn.com\/blog\/wp-json\/wp\/v2\/comments?post=928"}],"version-history":[{"count":7,"href":"https:\/\/www.dannysteyn.com\/blog\/wp-json\/wp\/v2\/posts\/928\/revisions"}],"predecessor-version":[{"id":972,"href":"https:\/\/www.dannysteyn.com\/blog\/wp-json\/wp\/v2\/posts\/928\/revisions\/972"}],"wp:attachment":[{"href":"https:\/\/www.dannysteyn.com\/blog\/wp-json\/wp\/v2\/media?parent=928"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.dannysteyn.com\/blog\/wp-json\/wp\/v2\/categories?post=928"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.dannysteyn.com\/blog\/wp-json\/wp\/v2\/tags?post=928"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}